BSOP 429 Week 4 Midterm (Version 1)
Multiple Choice – Page 1
- (TCO 12) _____ is the objective under JIT and time-based competition.
- (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system?
- (TCO 3) What happens to inventory as the number of kanban cards increases?
- (TCO 1) In managing supplier relations, which of the following is a beneficial setup?
- (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
- (TCO 9) Which of the following is true?
- (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____.
- (TCO 5) The amount of time covered by the basic MRP record is called the _____.
Essay Type – Page 2
- (TCO 1) Please explain PAC.
- (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact PAC? Explain.
- (TCO 6) Discuss the differences between MRP and JIT.
BSOP 429 Week 4 Midterm (Version 2)
Multiple Choice
- (TCO 12) Formal systems for shop floor control under JIT are _____.
- (TCO 2) An operation setback chart _____.
- (TCO 3) In order to minimize the number of orders waiting in the queue and maximize the number of orders processed in a center, which of the following rules should be used?
- (TCO 1) Which of the following is true?
- (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
- (TCO 9) Which of the following is true?
- (TCO 4) How much of total lead time is accounted for by queue time?
- (TCO 5) Gross requirements in an MRP record are _____ because they are stated as unique items for a given period.
Essay Type
- (TCO 1) List and briefly discuss the five main parts of the operations planning control (OPC) system.
- (TCO 2) What information should be provided into PAC as feedback and why they are important?
- (TCO 6) Compare and contrast JIT and MRP.